Retrofit of the control system for HVAC systems which is related to FARIS1 fast vessel
Big risk was available in replacing complete HVAC control system which was a part of centralized network, controlled directly from the ship marine-link specially if is using customizing communication protocols provided by Schneider. Also, huge cost was expected for getting the vessel to Jeddah Sea port and upland it to the dry-dock for weeks including body cutting, wielding and painting.
CESCO succeed to plan and execute the project during and between the ship normal trips by building all panels internally and satisfy the required migration from the supplied system to the central marine-link SCADA perfectly. This project was executed with 10% from the calculated budget.